2026 Water Mains & Street Reconstruction
- Location: Sunnyside Ave from Windsor Dr. to Wakefield St.
- Full street reconstruction to follow water main installation. - Location: Portsmouth Ave from Gladstone St. to Roosevelt Rd.
- Street will be patched following water main installation. Street will be paved in 2027.
2026 Street Resurfacing
Mobilization of equipment and materials, layout, and saw cutting will begin on:
- Stratford Ave from the cul-de-sac to Wakefield St.
- Wakefield St. from Stratford Ave to Sunnyside Ave.
2026 Alley Reconstruction
Reconstruction of the alleys just south of Roosevelt Rd. from Heidorn Ave to Haase Ave will commence:
- Date: Saturday, May 30
Time: 8:00 AM Start
All alleys will undergo capping, grading, and underdrain installation.
Please be mindful of construction crews and drive safely through these areas. For more information, contact Public Works at (708) 345-0041.